Quick answer: before cabinet installation day, confirm the final cabinet plan, appliance dimensions, finished wall conditions, floor condition, plumbing/electrical locations, fillers and panels, delivery access and exactly who is responsible for each part of the scope. Many installation problems start before the first cabinet is hung.
1. Make sure the cabinet plan matches the room
Final measurements should reflect the actual finished space. Check wall lengths, ceiling height, windows, doors, bulkheads and anything that projects into the cabinet run. Do not rely only on an old builder plan or measurements taken before demolition if the room has changed.
2. Confirm appliance dimensions, not just nominal sizes
A “36-inch refrigerator” description does not replace the manufacturer dimensions. Width, height, depth, door swing, required clearances and ventilation can affect adjacent cabinets and panels. The same principle applies to ranges, dishwashers, microwaves and hood units.
3. Know where fillers are required
Fillers are not automatically wasted space. They can provide door/drawer clearance beside walls, accommodate out-of-square conditions and allow the installer to create a clean finished run. Removing a planned filler to gain a few inches can cause interference elsewhere.
4. Identify every exposed end
Ask which cabinet sides will be visible after installation. Finished end panels, dishwasher panels, refrigerator panels and island/peninsula backs should be shown in the plan and included in the material list where required.
5. Check the walls and floor
Cabinets are rigid; houses are not always perfectly square, level or plumb. Large humps, damaged drywall or severe floor variation should be identified before installation. The installer can make normal adjustments, but major substrate problems may require additional work.
6. Coordinate plumbing and electrical
The sink, dishwasher, range, hood and other equipment need services in workable locations. Confirm trade responsibilities before cabinet installation so a cabinet does not arrive only to discover that plumbing or electrical must be moved through it unexpectedly.
7. Decide the flooring sequence
Different projects use different flooring sequences. What matters is that finished floor heights, appliance openings, toe kicks and transitions are considered before cabinets are permanently installed.
8. Protect the countertop schedule
Quartz templating generally happens after the base cabinets are installed and their final positions are confirmed. If a base cabinet, island or panel is missing or moving, templating may need to wait.
9. Confirm what “installation” includes
Ask whether the quote includes cabinet assembly, hanging/levelling, fillers, panels, toe kicks, handles, crown/trim, appliance panels, removal of packaging and disposal of old cabinetry. An installation price is only meaningful when its scope is clear.
10. Plan delivery and access
Clear a safe route from the delivery point to the kitchen and confirm where cabinets can be staged without blocking trades. Inspect delivered items against the cabinet list so missing or damaged pieces can be identified early.
Burlington pre-install checklist
- Final drawing approved
- Wall and ceiling measurements verified
- Appliance model dimensions confirmed
- Sink selected
- Plumbing/electrical locations coordinated
- Floor condition and sequence confirmed
- Fillers, toe kicks and panels on the material list
- Delivery access cleared
- Countertop templating sequence understood
- Installation inclusions written into the quote
FAQ
Should appliances be purchased before cabinets?
You should at minimum have reliable final appliance specifications before the cabinet plan is released, particularly for refrigerators, ranges, built-in appliances and hood equipment.
When is quartz templated?
Typically after base cabinets are installed and finalized so the fabricator can measure the actual finished cabinet layout.
Do installers fix crooked walls?
Normal irregularities are managed with levelling, scribing and fillers. Significant wall or floor problems may require separate corrective work.
Are handles normally part of cabinet installation?
That depends on the quote. Hardware drilling and installation should be explicitly included or excluded rather than assumed.
Preparing for kitchen cabinet installation in Burlington, Oakville or Waterdown? Kitchen4Less can review the plan, measurements and material list before installation so missing finishing pieces are caught earlier.